52 sourced
practice diagrams
Every diagram cites its primary source: JCT 2024, BSA 2022, CDM 2015, RIBA PSC 2020, ARB Code 2025. Download editable SVG files for your own study notes and PEDR documentation.
Procurement Routes: Risk & Design Control Matrix
JCT 2024 Suite · RIBA PoW 2020
BSA 2022: Higher-Risk Building Gateway Process
Building Safety Act 2022
CDM 2015: Duty Holder Relationships & Obligations
CDM Regulations 2015 · HSE L153
JCT 2024 Suite: Contract Family
JCT 2024 Suite
RIBA PSC 2020: Copyright Ownership & Licence Chain
RIBA PSC 2020 · CDPA 1988
RIBA Plan of Work 2020: Stage Overview
RIBA Plan of Work 2020
JCT SBC 2024: Extension of Time Process
JCT SBC 2024 Cl. 2.27–2.29
ARB Code: Key Changes from the 2017 Code
The Architects Code 2025 (ARB) · ARB Architects Code 2017
JCT SBC 2024: Payment Notice Timeline
JCT SBC 2024 Cl. 4.9–4.11 · HGCRA 1996
JCT SBC 2024 cl. 8: Termination Decision Tree
JCT SBC 2024 Cl. 8.4, 8.5, 8.7
CDM 2015: Notifiable Project Threshold Flowchart
CDM Regulations 2015 Reg. 6 & 7
BSA 2022: Accountable Person Hierarchy (HRBs)
Building Safety Act 2022 ss.65–91
RIBA Plan of Work 2020: Stage Gate Triggers
RIBA Plan of Work 2020
D&B Novation: Pre and Post Transfer Liability
CIC Novation 2018 · RIBA PSC 2020
Planning Appeals: Routes and Timing (TCPA 1990 s.78)
TCPA 1990 s.78 · PINS Procedural Guide
ARB Fitness to Practise: Complaint to Sanction
Architects Act 1997 ss.14–22
Limitation Periods: Patent, Latent, and Statutory Longstop
Limitation Act 1980 · LDA 1986 · BSA 2022
PI Insurance: Primary, Excess, Run-off Cover
ARB Code 2025 Standard 7 · RIBA PII guidance
Dispute Resolution: Adjudication vs Arbitration vs Litigation
HGCRA 1996 s.108 · Arbitration Act 1996 · CPR Part 60
JCT SBC 2024: Extension of Time Relevant Events Matrix
JCT SBC 2024 cl 2.29.1 to 2.29.16 · cl 4.22
Net Contribution Clause: Liability Split Comparison
RIBA PSC 2020 cl 7.3 · UCTA 1977 · Langstane 2009
RIBA PSC 2020: Schedule of Services Mapped to Plan of Work
RIBA PSC 2020 Schedule 1 · Plan of Work 2020
BSA 2022: Higher-Risk Building Definition Tests
BSA 2022 s.65 · HRB Regulations 2023
Copyright Ownership: Novation Chain in D and B
CDPA 1988 · RIBA PSC 2020 cl 6 · CIC Novation 2018
Pre-application Planning Consultation Flowchart
NPPF 2024 para 39 · TCPA 1990 · LPA pre-app services
QMS Certification Hierarchy: ISO 9001 in Practice
ISO 9001:2015 · UKAS · RIBA Chartered Practice Manual
JCT DB: Design Freeze and Information Release Sequence
JCT DB 2024 cl 2.7 to 2.17 · RIBA PSC 2020
Defects Liability Period: PC to Final Certificate
JCT SBC 2024 cl 2.27, 2.38, 2.39, 4.26
CDM 2015: F10 Notification Sequence
CDM 2015 Reg 6 and 7 · HSE F10 online form
BSA 2022 Gateway 2: Submission Checklist
HRB Procedures Regs 2023 reg 13 · BSR guidance
JCT Contract Family Tree (2024 Suite)
JCT 2024 Suite · JCTltd.co.uk
Construction Phase Health and Safety Plan Structure
CDM 2015 Reg 12 · HSE L153 Appendix 3
Party Wall etc. Act 1996: Award Process
Party Wall etc. Act 1996 ss.1-10 · RICS PW GN 2023
Latent Defects Insurance: Cover Structure and Triggers
DPA 1972 s.1 · BSA 2022 s.135 · ABI BPS guidance
RIBA CPD Cycle: 35 Hours Annual Plan
RIBA CPD Goals 2024 · ARB CPD scheme 2024
RIBA PSC Appointment Termination Decision Tree
RIBA PSC 2020 cl 8.4, 8.5, 8.7
Named Specialist vs Provisional Sum: JCT Mechanics
JCT SBC 2024 cl 3.8 and cl 3.16
Collateral Warranty Chain: Architect to Funder
CIC CWa 2018 · Contracts (Rights of Third Parties) Act 1999
Practical Completion vs Making Good: Test and Effect
JCT SBC 2024 cl 2.27, 2.38, 2.39 · Mears v Costplan 2019
NEC4 Early Warning Mechanism
NEC4 ECC cl 15 and cl 60
RIBA PSC 2020: Liability Cap Mechanics
RIBA PSC 2020 cl 7.2 and 7.3 · UCTA 1977
ARB Code 2025: Standards 1 to 6 Overview
ARB Architects Code 2025 · Architects Act 1997
Contract Selection: The JCT 2024 Suite
JCT 2024 Suite (MW/IC/SBC/DB/MP) · JCT 2024 Guides · Which Contract? Lupton & Stellakis
JCT SBC 2024: Contractor's Designed Portion — Liability Standard
JCT SBC 2024 Cl. 2.19.1.1, 2.19.1.2, 2.13.2
Defective Premises Act 1972 & BSA 2022 Limitation Extensions
Defective Premises Act 1972 ss.1, 2A · Building Safety Act 2022 s.135 · Limitation Act 1980
JCT SBC 2024: Variations — Instruction & Valuation
JCT SBC 2024 Cl. 3.14.1, 5.1, 5.3, Schedule 2, 5.6–5.10
Statutory Adjudication: The 28-Day Timeline
HGCRA 1996 s.108 (am. LDEDCA 2009) · Scheme for Construction Contracts
Architect's Fee Bases: Risk & Suitability
RIBA Good Practice Guide: Fees / Fee Management · RIBA PSC 2020
Two-Stage Tendering & the Pre-Construction Services Agreement
JCT PCSA 2024 & PCSA/SP 2024 · Part 3+ Tendering & Building Contracts
Practice Business Structures: Liability, Tax & Registration
Architect's Handbook of Practice Management · RIBA Starting a Practice · Architects Act 1997
JCT SBC 2024: Insurance of the Works — Options A / B / C
JCT SBC 2024 Cl. 6.7 · Schedule 3 paras A.1, B.1, C.1, C.2
Listed Building Consent & the Heritage Harm Test
Planning (Listed Buildings & Conservation Areas) Act 1990 ss.7, 9 · NPPF 2024 paras 214–215
Editable vector diagrams
Click the SVG button on any diagram to download. Open in Figma, Illustrator, or Inkscape. Every diagram includes source references. Perfect for your PEDR documentation.